EMR

How US Health Systems Actually Buy Software

Dennis Ward
Business, US Sales, AST
Oct 19, 20269 min read
Extreme close-up of a staple in the corner of a thick stack of uncoated paper, the cut edges and paper fibre filling the frame in soft overcast light.
TL;DR The technical evaluation is rarely what kills a health system software deal. What kills it is a security review nobody scoped time for, a committee that meets monthly, an integration dependency on a third party who was never in the conversation, or a budget line that belongs to a department with no stake in the outcome. If you are selling into a US health system — or buying and wondering why your own process takes nine months — the mechanics below are the part that actually decides it.

I have spent most of my career on the selling side of complex enterprise deals, and the pattern I kept running into is the same one I now watch play out in healthcare. The technical conversation goes well. The demo lands. Everyone in the room agrees the thing should exist. Then four months pass and nothing has moved, and when you finally get an honest answer it has nothing to do with the software.

Healthcare makes this worse than most industries, because the number of people who can stop a purchase is unusually high and the number who can start one is unusually low. Understanding where those people sit is most of the job.

There are three buyers, and none of them can say yes alone

In almost every health system deal of any size there are three constituencies, and they want different things.

The clinical or operational sponsor is the one with the problem. A VP of revenue cycle watching denials climb, a CMIO whose physicians are charting at nine at night. They have urgency, they will champion you internally, and in most systems they do not control the money.

The IT and security organisation owns the risk. They are measured on breaches that did not happen and integrations that did not break, which means their incentive runs opposite to speed. They cannot usually approve a purchase, but any one of them can stop it indefinitely, and they frequently do.

The finance and procurement side owns the contract and the budget calendar. They care about which bucket the spend comes from, whether it was planned, and what the exit looks like if it fails.

A deal moves when all three are satisfied at roughly the same time. Most stalls I have seen are not a rejection from any of them — they are the three being satisfied months apart.

Pro Tip: On the first call, ask who has to agree and who has to approve. They are different lists, and the person in front of you can usually recite both. If they cannot, the project is earlier than it sounds.

Security review is the real gate, and it starts before you expect

If the software will touch PHI — and in healthcare it usually will — third-party risk assessment is not a formality at the end. It is the longest pole, and it often begins the moment IT hears your name.

What you will be asked for is reasonably predictable: a completed security questionnaire, a SOC 2 Type II report or HITRUST certification, evidence of recent penetration testing, your subprocessor list, your breach notification process, and a signed Business Associate Agreement before anything with patient data moves. Larger systems route this through a dedicated vendor risk platform, and the assessment goes into a queue with everyone else's.

Two things reliably add months here. The first is arriving without the artefacts and assembling them under deadline. The second is a subprocessor nobody mentioned — an AI model provider, an offshore delivery team, a cloud region outside the US — surfacing halfway through review. That is not a disqualifier by itself, but discovering it late converts a routine assessment into a trust problem.

We treat this as an engineering concern rather than a sales one, which is why SOC 2 readiness and HIPAA compliance architecture are things AST builds into delivery rather than documenting afterwards. The difference shows up in how long review takes, not in whether you pass it.

Key Insight: Ask for the security questionnaire in the first fortnight, before anyone has asked you for it. You will look prepared, and more usefully, you will find out in week two rather than month four which answer you do not have.

Procurement runs on a calendar, not on momentum

This is the part that surprises people coming from software sales elsewhere. A health system's buying machinery runs on cycles that have nothing to do with how your conversation is going.

Capital expenditure is frequently planned a year ahead, and if your project was not in that plan it may genuinely have to wait for the next one — or be restructured as an operating expense, which changes who approves it. Many systems run fiscal years that do not match the calendar, so the urgency your sponsor feels in March may be shaped by a budget that resets in July. Committees that review new technology often meet monthly, and missing one by three days costs you four weeks.

None of this is obstruction. It is how an organisation that cannot afford surprises manages spending. But it means the single most useful question in a first call is rarely about requirements.

Where deals actually die

Having watched a fair number of these go sideways, the failure modes repeat.

  • A champion with no budget. The most enthusiastic person in the room is often the one furthest from the money. Enthusiasm is necessary and it is not sufficient.
  • Scope that crosses two departments. A project touching both clinical documentation and billing needs two sponsors who each think the other should pay. These stall quietly, and usually permanently.
  • An unexamined integration dependency. If the work requires anything from the EHR vendor's own program or a third-party interface team, that timeline belongs to someone who is not in your meetings and has no stake in your quarter.
  • A pilot with no defined end. Pilots that were never scoped to conclude do not convert. They are extended, then defunded.
  • Silence read as progress. Long gaps in healthcare procurement are normal and tell you nothing. A deal with no internal advocate looks identical to a deal waiting on a committee, right up until it does not.
Warning: If nobody on the buyer's side can tell you which budget line the money comes from, you do not have a deal in progress. You have a project someone would like to do.

What integration actually adds to the timeline

Most proposals I see underestimate this, and not because anyone is being optimistic about the engineering. The engineering is usually the predictable part.

Writing into a chart is a different conversation from reading from one, and it tends to involve the EHR vendor rather than just the health system. Interface work is frequently queued behind the system's own projects. Test environments have their own access process. If the data has to reach a payer, that is another party with another timeline.

At AST we scope EHR integration by naming every party whose approval the work depends on before quoting a date, because a schedule that assumes only two organisations are involved will be wrong by months in a way that damages trust at exactly the point you need it. Our EMR/EHR development engagements start the same way, with the dependency map rather than the feature list.

What you hearWhat it usually meansWhat to do next
"Send us a proposal"Early. Often information-gathering for a budget request.Ask what the proposal needs to contain for whoever reads it next
"We need to loop in security"Genuine progress. The clock just started on the longest step.Request the questionnaire immediately; do not wait to be asked
"It's in the budget for next year"Real, but the timeline is fixed and not by you.Find out when planning closes — that is the actual deadline
"Let's start with a pilot"Could be either. Depends entirely on whether success is defined.Agree in writing what converts it, and when it ends
"We're reviewing internally"Tells you nothing on its own.Ask who is reviewing and what the next meeting is

How I would run the first conversation

  1. Map the three constituencies Ask directly who the clinical sponsor, the security owner and the budget holder are. Write down the names. If one is missing, that is the gap to work on, not the requirements document.
  2. Find the budget line Capital or operating, this year or next, whose department. This single answer predicts the timeline better than anything else you will learn.
  3. Start security early Ask for the vendor assessment process in the first two weeks. Volunteer your SOC 2 report, your subprocessor list and your BAA template before anyone requests them.
  4. Name every dependency List the organisations whose approval the work needs — the EHR vendor, an interface team, a payer, an existing vendor whose contract overlaps. Agree the list with the buyer so the timeline is shared rather than assumed.
  5. Scope the pilot to end Define what it proves, how long it runs, what number or judgement converts it, and who makes that call. A pilot without a defined conclusion is a subscription to being evaluated.
  6. Confirm the committee calendar Find out when the relevant group meets and work backwards. Most urgency in healthcare procurement is calendar urgency.

None of this is about being clever in the room. It is about finding out early which of the four things that can stop a deal is going to be the one that does, and dealing with it while there is still time.

Why this shapes how AST sells

We would rather lose a deal in week three than month nine, and that preference changes what the early conversations look like. We ask about budget lines before scope. We volunteer the compliance artefacts before they are requested. We put the dependency map in the proposal, including the parties we do not control, because a date that quietly assumes otherwise is a date we will miss.

It makes for a less comfortable first meeting than the version where everyone agrees the technology sounds good. It also means the projects that reach a contract tend to reach production, which is the only part either side is actually paid for.

How long does it take a US health system to buy software?
For anything touching PHI, six to twelve months is common, and the engineering evaluation is rarely the longest part. Third-party security review, committee cadence and budget cycle account for most of it. Smaller operating-expense purchases with an existing budget line can move considerably faster.
What do health systems ask for in a vendor security review?
Typically a completed security questionnaire, a SOC 2 Type II report or HITRUST certification, recent penetration test evidence, your subprocessor list, breach notification procedures, and a signed BAA before any PHI moves. Larger systems route this through a vendor risk platform, which adds queue time independent of your answers.
Why do healthcare software pilots fail to convert?
Usually because nobody agreed in advance what success meant or when the pilot ended. Without a defined conversion criterion and an owner for that decision, a pilot has no natural conclusion — it gets extended until the budget attention moves elsewhere.
Who actually approves a software purchase at a health system?
Rarely one person. A clinical or operational sponsor raises it, IT and security clear it, and finance or procurement contracts it. Any of the three can stop it; typically only finance can release the money. Knowing which of the three you have not met is the most useful thing to establish early.
Should a vendor push for a pilot or a full contract?
A pilot is a reasonable path when it is scoped to end, has a defined success measure, and names who decides. An open-ended pilot is usually worse than no deal, because it consumes delivery capacity while the buyer carries no commitment and the internal case never has to be made.

Talk to someone who has sat on both sides of this

If you are weighing an EMR build, an integration programme, or a compliance push and want a realistic read on the timeline before you take it internally, we are happy to walk through it with you.

Talk to our US team

Dennis Ward
Business, US Sales, AST
Dennis runs AST's business in the US. He spent two decades as a solutions architect and sales engineer selling complex systems into Fortune 500 enterprises — scoping the architecture, building the proof of concept, and making the business case alongside it. He holds AWS solution architecture credentials and a BS in Electrical Engineering from MIT.

Comments

Comments are warming up. Live, no-sign-in discussion will appear here shortly.

Have a question now? Email info@allstartech.net.

Get in touch
Work with AST

Embed a vetted engineering pod into your team and ship clinical software faster — without cutting a compliance corner.

Book a consultation
Careers at AST

We hire engineers who want to work inside real healthcare problems — EMR, FHIR, clinical AI and the compliance that holds it together.

See open roles